Our Work
Choose a category below to filter projects
DFW Connector ProjectSubcontractor to Northgate Constructors, LLCBuilt under a Comprehensive Development Agreement with Northgate Constructors, this eight mile project will improve safety, mobility and air quality by doubling roadway capacity with the addition of new general purpose lanes, toll managed lanes and continuous frontage roads north of DFW Airport which funnels five major highways through […]
Museum of Fine Arts – Houston – Kinder Pedestrian TunnelAR Daniel Construction Services, Inc. built the structure for the new pedestrian tunnel connecting the new Kinder building to the existing Law building beneath Bissonnet St. The Tunnel was a complex project with a curve and changing size as the tunnel progressed. Working with engineers, architects,…
Faith Missions International 70 Palms ProjectHelping to Rebuild HaitiAs a Board Member of AGC of America Charities, Art Daniel became aware of dedicated funds for Haitian earthquake relief and teamed the AGCA Charities with Faith Missions International’s 70 Palms Project. FMI operates the Hope Village orphanage in Haiti that has developed the bakery to serve…
TxDOT US 75 Collin CountySubcontractor to WW WebberAs a subcontractor to WW Webber AR Daniel Construction installed over 2,400 LF of 24′ RCP to 54′ RCP Storm drain lines by jacking or auger boring. With critical attention paid to scheduling on this multiple phased project, AR Daniel Construction crews installed the cross drainage culverts under…
LBJ Express East Bound Frontage Road Drain at Josey LaneSubcontractor to Trinity InfrastructureAR Daniel Construction installed a double barrel 8’x8′ reinforced box culvert fabricated by Rinker as a subcontractor to Trinity Infrastructure as part of the Public Private Partnership reconstruction of IH-635 ‘LBJ Freeway’. After constructing the shaft for this installation because the ground condition…
TxDOT Wilbarger CountySubcontractor to North Texas ContractingAs a subcontractor to North Texas Contracting, AR Daniel Construction jacked 240 LF of 6’x4′ box culvert supplied by Johnson County Pipe. The project was constructed in conjunction with a research grant from TxDOT to the Center for Underground Infrastructure Research and Education (CUIRE) to observe the impact of…
TxDOT Loop 12/SH 114 InterchangeSubcontractor to Mario Sinacola and Sons Excavating, Inc.Long a bottleneck in local freeway traffic flow, the Loop 12 and SH 114 interchange reconstruction by TxDOT was a project of the Diamond ZS joint venture of H.B. Zachry Construction and Mario Sinacola and Sons Excavating. Included in the project was extensive drainage…
LBJ Express ProjectSubcontractor to Trinity Infrastructure, LLCShaft excavation at Josey LaneKey drainage elements of the LBJ Express project in Dallas will provide for the drainage of the western portions of the Managed HOV lanes, which will be as much as sixty feet below the surrounding ground surface. To accomplish this drainage AR Daniel Construction constructed…
North Texas Municipal Water District Wylie Water Treatment PlantSubcontractor to Archer WesternAR Daniel Construction was contracted on an emergency basis to construct exploratory shafts adjacent to existing pump station in order to survey 48″ diameter discharge pipes for leaks and repairs as needed. AR Daniel Construction excavated eleven rectangular and three nine foot diameter circular…
Dallas Arboretum Pedestrian TunnelIn summer 2014, AR Daniel Construction Services, Inc. cut the tunnel to connect a new parking garage to the Children’s Adventure Garden at the Dallas Arboretum.Long faced with parking challenges, especially on weekends and during peak visitation periods, the Dallas Arboretum increased available parking with a new parking garage near the New…
TxDOT IH 35 McLennan CountySubcontractor to North Texas ContractingAs a sub-subcontractor to North Texas Contracting for utility relocations for general contractor Lane Construction, AR Daniel Construction constructed 384 LF of 72′ diameter tunnel with the use of a tunnel boring machine. This two pass tunnel method used tunnel liner plate furnished by DSI Underground as…
TxDOT Business US 287 Roadway and Drainage ImprovementsSubcontractor to Texas Sterling ConstructionInstallation of three 9’6″ tunnel liner plate tunnels for drainage under UPRR increasing the capacity of flow under the UPRR of the local creek to alleviate chronic flooding of Rosedale Street (Bus. US 287) and surrounding neighborhoods. Originally designed as a double barrel 10’x10’…
North Texas Municipal Water District Plano-Richardson West Side Replacement LineSubcontractor to Bar Constructors, Inc.An aging and deteriorating existing 48″ diameter waterline required replacement before peak summer demand season. AR Daniel Construction built 15 tunnels totaling over 3400 lineal feet of 72″ tunnel liner plate tunnels for the new 48″ steel waterline. The longest tunnel on…
NTMWD Texoma to Wylie PipelineSubcontractor to Garney CompaniesFacing a loss of up to 35% of their water supply due to invasive zebra mussels, the North Texas Water District needed to construct a pipeline from through Grayson and Collin Counties to their treated water treatment plant in Wylie, TX. To speed design and construction, NTMWD selected…
DFW Connector ProjectSubcontractor to Northgate Constructors, LLCBuilt under a Comprehensive Development Agreement with Northgate Constructors, this eight mile project will improve safety, mobility and air quality by doubling roadway capacity with the addition of new general purpose lanes, toll managed lanes and continuous frontage roads north of DFW Airport which funnels five major highways through…
Museum of Fine Arts – Houston – Kinder Pedestrian TunnelAR Daniel Construction Services, Inc. built the structure for the new pedestrian tunnel connecting the new Kinder building to the existing Law building beneath Bissonnet St. The Tunnel was a complex project with a curve and changing size as the tunnel progressed. Working with engineers, architects,…
Faith Missions International 70 Palms ProjectHelping to Rebuild HaitiAs a Board Member of AGC of America Charities, Art Daniel became aware of dedicated funds for Haitian earthquake relief and teamed the AGCA Charities with Faith Missions International’s 70 Palms Project. FMI operates the Hope Village orphanage in Haiti that has developed the bakery to serve…
TxDOT US 75 Collin CountySubcontractor to WW WebberAs a subcontractor to WW Webber AR Daniel Construction installed over 2,400 LF of 24′ RCP to 54′ RCP Storm drain lines by jacking or auger boring. With critical attention paid to scheduling on this multiple phased project, AR Daniel Construction crews installed the cross drainage culverts under…
LBJ Express East Bound Frontage Road Drain at Josey LaneSubcontractor to Trinity InfrastructureAR Daniel Construction installed a double barrel 8’x8′ reinforced box culvert fabricated by Rinker as a subcontractor to Trinity Infrastructure as part of the Public Private Partnership reconstruction of IH-635 ‘LBJ Freeway’. After constructing the shaft for this installation because the ground condition…
TxDOT Wilbarger CountySubcontractor to North Texas ContractingAs a subcontractor to North Texas Contracting, AR Daniel Construction jacked 240 LF of 6’x4′ box culvert supplied by Johnson County Pipe. The project was constructed in conjunction with a research grant from TxDOT to the Center for Underground Infrastructure Research and Education (CUIRE) to observe the impact of…
TxDOT Loop 12/SH 114 InterchangeSubcontractor to Mario Sinacola and Sons Excavating, Inc.Long a bottleneck in local freeway traffic flow, the Loop 12 and SH 114 interchange reconstruction by TxDOT was a project of the Diamond ZS joint venture of H.B. Zachry Construction and Mario Sinacola and Sons Excavating. Included in the project was extensive drainage…
LBJ Express ProjectSubcontractor to Trinity Infrastructure, LLCShaft excavation at Josey LaneKey drainage elements of the LBJ Express project in Dallas will provide for the drainage of the western portions of the Managed HOV lanes, which will be as much as sixty feet below the surrounding ground surface. To accomplish this drainage AR Daniel Construction constructed…
North Texas Municipal Water District Wylie Water Treatment PlantSubcontractor to Archer WesternAR Daniel Construction was contracted on an emergency basis to construct exploratory shafts adjacent to existing pump station in order to survey 48″ diameter discharge pipes for leaks and repairs as needed. AR Daniel Construction excavated eleven rectangular and three nine foot diameter circular…
Dallas Arboretum Pedestrian TunnelIn summer 2014, AR Daniel Construction Services, Inc. cut the tunnel to connect a new parking garage to the Children’s Adventure Garden at the Dallas Arboretum.Long faced with parking challenges, especially on weekends and during peak visitation periods, the Dallas Arboretum increased available parking with a new parking garage near the New…
TxDOT IH 35 McLennan CountySubcontractor to North Texas ContractingAs a sub-subcontractor to North Texas Contracting for utility relocations for general contractor Lane Construction, AR Daniel Construction constructed 384 LF of 72′ diameter tunnel with the use of a tunnel boring machine. This two pass tunnel method used tunnel liner plate furnished by DSI Underground as…
TxDOT Business US 287 Roadway and Drainage ImprovementsSubcontractor to Texas Sterling ConstructionInstallation of three 9’6″ tunnel liner plate tunnels for drainage under UPRR increasing the capacity of flow under the UPRR of the local creek to alleviate chronic flooding of Rosedale Street (Bus. US 287) and surrounding neighborhoods. Originally designed as a double barrel 10’x10’…
North Texas Municipal Water District Plano-Richardson West Side Replacement LineSubcontractor to Bar Constructors, Inc.An aging and deteriorating existing 48″ diameter waterline required replacement before peak summer demand season. AR Daniel Construction built 15 tunnels totaling over 3400 lineal feet of 72″ tunnel liner plate tunnels for the new 48″ steel waterline. The longest tunnel on…
NTMWD Texoma to Wylie PipelineSubcontractor to Garney CompaniesFacing a loss of up to 35% of their water supply due to invasive zebra mussels, the North Texas Water District needed to construct a pipeline from through Grayson and Collin Counties to their treated water treatment plant in Wylie, TX. To speed design and construction, NTMWD selected…
DFW Connector ProjectSubcontractor to Northgate Constructors, LLCBuilt under a Comprehensive Development Agreement with Northgate Constructors, this eight mile project will improve safety, mobility and air quality by doubling roadway capacity with the addition of new general purpose lanes, toll managed lanes and continuous frontage roads north of DFW Airport which funnels five major highways through…