• About Us
  • Services
  • Our Work
  • Job Openings
  • Contact

972-291-3304

Download Fact Sheet

972-291-3304

Fact Sheet
  • Home
  • About Us
  • Services
  • Our Work
  • Job Openings
  • 972-291-3304
  • Download Fact Sheet
  • Contact

North Texas Municipal Water District Wylie Water Treatment Plant

Subcontractor to Archer Western

AR Daniel Construction was contracted on an emergency basis to construct exploratory shafts adjacent to existing pump station in order to survey 48" diameter discharge pipes for leaks and repairs as needed. AR Daniel Construction excavated eleven rectangular and three nine foot diameter circular shafts adjacent to the pump station for the evaluation process.

506 Tidwell St. Cedar Hill, TX 75104

Office: 972-291-3304
Fax: 972-291-4475
Follow Us on Facebook
Send Us a Message

© Copyright 2023
Site Design by TIK:TALK

Send a Message

to AR Daniel Construction

Thank you for your message, a member of our team will respond soon.

Failed to send message!