• About Us
  • Services
  • Our Work
  • Job Openings
  • Contact

972-291-3304

Download Fact Sheet

972-291-3304

Fact Sheet
  • Home
  • About Us
  • Services
  • Our Work
  • Job Openings
  • 972-291-3304
  • Download Fact Sheet
  • Contact

LBJ Express East Bound Frontage Road Drain at Josey Lane

Subcontractor to Trinity Infrastructure

AR Daniel Construction installed a double barrel 8'x8' reinforced box culvert fabricated by Rinker as a subcontractor to Trinity Infrastructure as part of the Public Private Partnership reconstruction of IH-635 'LBJ Freeway'. After constructing the shaft for this installation because the ground condition was extremely sandy contrary to the soils investigation provided, it was determined that a pilot tunnel needed to be utilized to keep the box culvert from settling down below the design grade during the jacking operation. Due to the width of the box, two pilot tunnels were constructed for each barrel of the box culvert.

506 Tidwell St. Cedar Hill, TX 75104

Office: 972-291-3304
Fax: 972-291-4475
Follow Us on Facebook
Send Us a Message

© Copyright 2023
Site Design by TIK:TALK

Send a Message

to AR Daniel Construction

Thank you for your message, a member of our team will respond soon.

Failed to send message!