TxDOT US 75 Collin County

TxDOT US 75 Collin CountySubcontractor to WW WebberAs a subcontractor to WW Webber AR Daniel Construction installed over 2,400 LF of 24′ RCP to 54′ RCP Storm drain lines by jacking or auger boring. With critical attention paid to scheduling on this multiple phased project, AR Daniel Construction crews installed the cross drainage culverts under […]

LBJ Express East Bound Frontage Road Drain at Josey Lane

LBJ Express East Bound Frontage Road Drain at Josey LaneSubcontractor to Trinity InfrastructureAR Daniel Construction installed a double barrel 8’x8′ reinforced box culvert fabricated by Rinker as a subcontractor to Trinity Infrastructure as part of the Public Private Partnership reconstruction of IH-635 ‘LBJ Freeway’. After constructing the shaft for this installation because the ground condition […]

TxDOT Wilbarger County

TxDOT Wilbarger CountySubcontractor to North Texas ContractingAs a subcontractor to North Texas Contracting, AR Daniel Construction jacked 240 LF of 6’x4′ box culvert supplied by Johnson County Pipe. The project was constructed in conjunction with a research grant from TxDOT to the Center for Underground Infrastructure Research and Education (CUIRE) to observe the impact of […]

TxDOT Loop 12/SH 114 Interchange

TxDOT Loop 12/SH 114 InterchangeSubcontractor to Mario Sinacola and Sons Excavating, Inc.Long a bottleneck in local freeway traffic flow, the Loop 12 and SH 114 interchange reconstruction by TxDOT was a project of the Diamond ZS joint venture of H.B. Zachry Construction and Mario Sinacola and Sons Excavating. Included in the project was extensive drainage […]

AllHorizontal Earth BoringTunnelingShaft ExcavationPipe JackingStewardship

TxDOT US 75 Collin County

TxDOT US 75 Collin CountySubcontractor to WW WebberAs a subcontractor to WW Webber AR Daniel Construction installed over 2,400 LF of 24′ RCP to 54′ RCP Storm drain lines by jacking or auger boring. With critical attention paid to scheduling on this multiple phased project, AR Daniel Construction crews installed the cross drainage culverts under…

LBJ Express East Bound Frontage Road Drain at Josey Lane

LBJ Express East Bound Frontage Road Drain at Josey LaneSubcontractor to Trinity InfrastructureAR Daniel Construction installed a double barrel 8’x8′ reinforced box culvert fabricated by Rinker as a subcontractor to Trinity Infrastructure as part of the Public Private Partnership reconstruction of IH-635 ‘LBJ Freeway’. After constructing the shaft for this installation because the ground condition…

TxDOT Wilbarger County

TxDOT Wilbarger CountySubcontractor to North Texas ContractingAs a subcontractor to North Texas Contracting, AR Daniel Construction jacked 240 LF of 6’x4′ box culvert supplied by Johnson County Pipe. The project was constructed in conjunction with a research grant from TxDOT to the Center for Underground Infrastructure Research and Education (CUIRE) to observe the impact of…

TxDOT Loop 12/SH 114 Interchange

TxDOT Loop 12/SH 114 InterchangeSubcontractor to Mario Sinacola and Sons Excavating, Inc.Long a bottleneck in local freeway traffic flow, the Loop 12 and SH 114 interchange reconstruction by TxDOT was a project of the Diamond ZS joint venture of H.B. Zachry Construction and Mario Sinacola and Sons Excavating. Included in the project was extensive drainage…

AllHorizontal Earth BoringTunnelingShaft ExcavationPipe JackingStewardship

DFW Connector Project

DFW Connector ProjectSubcontractor to Northgate Constructors, LLCBuilt under a Comprehensive Development Agreement with Northgate Constructors, this eight mile project will improve safety, mobility and air quality by doubling roadway capacity with the addition of new general purpose lanes, toll managed lanes and continuous frontage roads north of DFW Airport which funnels five major highways through…

506 Tidwell St. Cedar Hill, TX 75104

Office: 972-291-3304
Fax: 972-291-4475
Follow Us on Facebook
Send Us a Message

© Copyright 2023
Site Design by TIK:TALK

Send a Message

to AR Daniel Construction

Thank you for your message, a member of our team will respond soon.

Failed to send message!