LBJ Express ProjectSubcontractor to Trinity Infrastructure, LLCShaft excavation at Josey LaneKey drainage elements of the LBJ Express project in Dallas will provide for the drainage of the western portions of the Managed HOV lanes, which will be as much as sixty feet below the surrounding ground surface. To accomplish this drainage AR Daniel Construction constructed […]
North Texas Municipal Water District Wylie Water Treatment PlantSubcontractor to Archer WesternAR Daniel Construction was contracted on an emergency basis to construct exploratory shafts adjacent to existing pump station in order to survey 48″ diameter discharge pipes for leaks and repairs as needed. AR Daniel Construction excavated eleven rectangular and three nine foot diameter circular […]
LBJ Express ProjectSubcontractor to Trinity Infrastructure, LLCShaft excavation at Josey LaneKey drainage elements of the LBJ Express project in Dallas will provide for the drainage of the western portions of the Managed HOV lanes, which will be as much as sixty feet below the surrounding ground surface. To accomplish this drainage AR Daniel Construction constructed…
North Texas Municipal Water District Wylie Water Treatment PlantSubcontractor to Archer WesternAR Daniel Construction was contracted on an emergency basis to construct exploratory shafts adjacent to existing pump station in order to survey 48″ diameter discharge pipes for leaks and repairs as needed. AR Daniel Construction excavated eleven rectangular and three nine foot diameter circular…
Faith Missions International 70 Palms ProjectHelping to Rebuild HaitiAs a Board Member of AGC of America Charities, Art Daniel became aware of dedicated funds for Haitian earthquake relief and teamed the AGCA Charities with Faith Missions International’s 70 Palms Project. FMI operates the Hope Village orphanage in Haiti that has developed the bakery to serve…