Our Work
Choose a category below to filter projects
LBJ Express ProjectSubcontractor to Trinity Infrastructure, LLCShaft excavation at Josey LaneKey drainage elements of the LBJ Express project in Dallas will provide for the drainage of the western portions of the Managed HOV lanes, which will be as much as sixty feet below the surrounding ground surface. To accomplish this drainage AR Daniel Construction constructed […]
North Texas Municipal Water District Wylie Water Treatment PlantSubcontractor to Archer WesternAR Daniel Construction was contracted on an emergency basis to construct exploratory shafts adjacent to existing pump station in order to survey 48″ diameter discharge pipes for leaks and repairs as needed. AR Daniel Construction excavated eleven rectangular and three nine foot diameter circular […]
TxDOT US 75 Collin CountySubcontractor to WW WebberAs a subcontractor to WW Webber AR Daniel Construction installed over 2,400 LF of 24′ RCP to 54′ RCP Storm drain lines by jacking or auger boring. With critical attention paid to scheduling on this multiple phased project, AR Daniel Construction crews installed the cross drainage culverts under…
LBJ Express East Bound Frontage Road Drain at Josey LaneSubcontractor to Trinity InfrastructureAR Daniel Construction installed a double barrel 8’x8′ reinforced box culvert fabricated by Rinker as a subcontractor to Trinity Infrastructure as part of the Public Private Partnership reconstruction of IH-635 ‘LBJ Freeway’. After constructing the shaft for this installation because the ground condition…
TxDOT Wilbarger CountySubcontractor to North Texas ContractingAs a subcontractor to North Texas Contracting, AR Daniel Construction jacked 240 LF of 6’x4′ box culvert supplied by Johnson County Pipe. The project was constructed in conjunction with a research grant from TxDOT to the Center for Underground Infrastructure Research and Education (CUIRE) to observe the impact of…
TxDOT Loop 12/SH 114 InterchangeSubcontractor to Mario Sinacola and Sons Excavating, Inc.Long a bottleneck in local freeway traffic flow, the Loop 12 and SH 114 interchange reconstruction by TxDOT was a project of the Diamond ZS joint venture of H.B. Zachry Construction and Mario Sinacola and Sons Excavating. Included in the project was extensive drainage…
DFW Connector ProjectSubcontractor to Northgate Constructors, LLCBuilt under a Comprehensive Development Agreement with Northgate Constructors, this eight mile project will improve safety, mobility and air quality by doubling roadway capacity with the addition of new general purpose lanes, toll managed lanes and continuous frontage roads north of DFW Airport which funnels five major highways through…