Author: admin

TxDOT IH 35 McLennan County

TxDOT IH 35 McLennan CountySubcontractor to North Texas ContractingAs a sub-subcontractor to North Texas Contracting for utility relocations for general contractor Lane Construction, AR Daniel Construction constructed 384 LF of 72′ diameter tunnel with the use of a tunnel boring machine. This two pass tunnel method used tunnel liner plate furnished by DSI Underground as […]

Read Full Article

TxDOT Business US 287 Roadway and Drainage Improvements

TxDOT Business US 287 Roadway and Drainage ImprovementsSubcontractor to Texas Sterling ConstructionInstallation of three 9’6″ tunnel liner plate tunnels for drainage under UPRR increasing the capacity of flow under the UPRR of the local creek to alleviate chronic flooding of Rosedale Street (Bus. US 287) and surrounding neighborhoods. Originally designed as a double barrel 10’x10′ […]

Read Full Article

North Texas Municipal Water District Plano-Richardson West Side Replacement Line

North Texas Municipal Water District Plano-Richardson West Side Replacement LineSubcontractor to Bar Constructors, Inc.An aging and deteriorating existing 48″ diameter waterline required replacement before peak summer demand season. AR Daniel Construction built 15 tunnels totaling over 3400 lineal feet of 72″ tunnel liner plate tunnels for the new 48″ steel waterline. The longest tunnel on […]

Read Full Article

DFW Connector Project

DFW Connector ProjectSubcontractor to Northgate Constructors, LLCBuilt under a Comprehensive Development Agreement with Northgate Constructors, this eight mile project will improve safety, mobility and air quality by doubling roadway capacity with the addition of new general purpose lanes, toll managed lanes and continuous frontage roads north of DFW Airport which funnels five major highways through […]

Read Full Article