Author: admin

Museum of Fine Arts – Houston – Kinder Pedestrian Tunnel

Museum of Fine Arts – Houston – Kinder Pedestrian TunnelAR Daniel Construction Services, Inc. built the structure for the new pedestrian tunnel connecting the new  Kinder building to the existing Law building beneath Bissonnet St. The Tunnel was a complex project with a curve and changing size as the tunnel progressed. Working with engineers, architects, […]

Read Full Article

Faith Missions International 70 Palms Project

Faith Missions International 70 Palms ProjectHelping to Rebuild HaitiAs a Board Member of AGC of America Charities, Art Daniel became aware of dedicated funds for Haitian earthquake relief and teamed the AGCA Charities with Faith Missions International’s 70 Palms Project. FMI operates the Hope Village orphanage in Haiti that has developed the bakery to serve […]

Read Full Article

LBJ Express East Bound Frontage Road Drain at Josey Lane

LBJ Express East Bound Frontage Road Drain at Josey LaneSubcontractor to Trinity InfrastructureAR Daniel Construction installed a double barrel 8’x8′ reinforced box culvert fabricated by Rinker as a subcontractor to Trinity Infrastructure as part of the Public Private Partnership reconstruction of IH-635 ‘LBJ Freeway’. After constructing the shaft for this installation because the ground condition […]

Read Full Article

TxDOT Wilbarger County

TxDOT Wilbarger CountySubcontractor to North Texas ContractingAs a subcontractor to North Texas Contracting, AR Daniel Construction jacked 240 LF of 6’x4′ box culvert supplied by Johnson County Pipe. The project was constructed in conjunction with a research grant from TxDOT to the Center for Underground Infrastructure Research and Education (CUIRE) to observe the impact of […]

Read Full Article

North Texas Municipal Water District Wylie Water Treatment Plant

North Texas Municipal Water District Wylie Water Treatment PlantSubcontractor to Archer WesternAR Daniel Construction was contracted on an emergency basis to construct exploratory shafts adjacent to existing pump station in order to survey 48″ diameter discharge pipes for leaks and repairs as needed. AR Daniel Construction excavated eleven rectangular and three nine foot diameter circular […]

Read Full Article

Dallas Arboretum Pedestrian Tunnel

Dallas Arboretum Pedestrian TunnelIn summer 2014, AR Daniel Construction Services, Inc. cut the tunnel to connect a new parking garage to the Children’s Adventure Garden at the Dallas Arboretum.Long faced with parking challenges, especially on weekends and during peak visitation periods, the Dallas Arboretum increased available parking with a new parking garage near the New […]

Read Full Article