North Texas Municipal Water District Wylie Water Treatment Plant
Subcontractor to Archer Western
AR Daniel Construction was contracted on an emergency basis to construct exploratory shafts adjacent to existing pump station in order to survey 48" diameter discharge pipes for leaks and repairs as needed. AR Daniel Construction excavated eleven rectangular and three nine foot diameter circular shafts adjacent to the pump station for the evaluation process.